The Palladam Electricity Board has scheduled a power outage on November 14, 2024, affecting areas served by the Selampalayam 110/22 KV SS substation. This planned outage is necessary for maintenance work to ensure infrastructure reliability.

Palladam Power Cut 14-11-2024

Key InformationDetails
CountryIndia
StateTamil Nadu
CityPalladam
Date of OutageNovember 14, 2024
TownSellampalaayam
SubstationSelampalayam 110/22 KV SS
FeederSelampalayam 110/22 KV SS
Type of WorkMaintenance Work
Outage Start TimeNovember 14, 2024, 9:00 AM
Outage End TimeNovember 14, 2024, 4:00 PM
Palladam Next Power Cut15-11-2024 (Check Here)
Power Cut Areas Affected TNEB

Palladam 14-11-2024 Power Cut Locations

The following areas in Palladam will be impacted by the power cut on November 14, 2024, due to scheduled maintenance work:

  • Chandrapuram Feeder
  • Ranjithapuram Feeder
  • Uthupalayam
  • Devanallur Feeder
  • K.M. Palayam Feeder

How to Check Palladam 13-11-2024 Power Cut Locations

Residents in Palladam can confirm outage details and check for updates on the electricity boardโ€™s website:

  • Visit the Official Electricity Board Website: Access the Tamil Nadu Electricity Board’s official website.
  • Locate the Scheduled Outage Section: Look for โ€œScheduled Maintenanceโ€ or โ€œPower Cut Informationโ€ on the homepage.
  • Select Your Area:
    • Choose the Town (e.g., “Sellampalaayam”) and relevant Substation (e.g., “Selampalayam 110/22 KV SS”) if needed.
  • Enter the Captcha Code: Complete the captcha for verification.
  • View Outage Details: Click โ€œSubmitโ€ or โ€œSearchโ€ to view current and scheduled outages, including affected areas and timings.

Preparation Tips for Palladam Residents

  • Charge Essential Devices: Ensure phones, power banks, and other necessary electronics are fully charged before the outage.
  • Prepare Backup Lighting: Use rechargeable LED lights or flashlights for safety.
  • Limit Refrigerator Access: Try to keep the refrigerator closed to help preserve food temperature during the outage.

After Palladam 13-11-2024 Power Restoration

Power is expected to return around 4:00 PM on November 14. Once power is restored, residents should:

  • Wait Before Reconnecting Appliances: Allow a few minutes for the system to stabilize before plugging in high-power or sensitive devices.
  • Monitor for Extended Outage Notifications: Follow updates in case additional maintenance time is required.
WhatsApp Group Join Now

Telegram Group Join Now

Leave a Comment