Udumalpet Power Outage Notification for 21st November 2024

The Tamil Nadu Generation and Distribution Corporation (TANGEDCO) has announced a planned power outage for Udumalpet on 21st November 2024. This outage is part of routine substation and feeder maintenance to ensure reliable service and is scheduled from 9:00 AM to 4:00 PM in the specified areas.

a silhouette of a man climbing a power line

Udumalpet Quick Overview of Power Outage 25-11-2024

CategoryDetails
CountryIndia
StateTamil Nadu
Scheduled Date21st November 2024
Outage Duration9:00 AM to 4:00 PM
Affected Divisions2
OrganizationTamil Nadu Generation and Distribution Corporation (TANGEDCO)
Purpose of OutageSubstation and Feeder Maintenance
Primary Areas AffectedMuthur, Ayyampalayam, Nallur, Vadugapalayam, Mannur, Ramapattinam, Devampadi, Vallaiyakoundannur, Bodipalayam, Sakthigarden, Golden City, Gandhinagar, Ponnapuram, Sangampalayam, Valavan Nagar, JJ Kalani, M.N. Palayam, Vaalai Kombunaagur, Subiyakoundanpudur, Alangadavu, Valanthayamaram, Meenakshipuram, Kulathupudur, Pariyothu, Dheevanshapudur, Kanapathipalayam, Kovinthapuram, Kaaliyappa Koundanpudur, Aathupollachi
Substations InvolvedThalakkarai Muthur 110/22 KV, Marichanaicken Palayam 110 KV
Type of WorkRoutine maintenance for substation and feeder lines
Next Power Cut25-11-2024 (Check Here)

Following the table above, further details on the power outage, maintenance activities, and specific areas impacted in Udumalpet are provided below to assist residents with preparations.

Power Cut Areas Affected TNEB

Udumalpet Power Cut 21-1-2024: Substations and Feeder Details

The maintenance work will involve two primary substations: Thalakkarai Muthur 110/22 KV Substation and Marichanaicken Palayam 110 KV Substation.

Thalakkarai Muthur Power Cut 21-1-2024:

The Thalakkarai Muthur 110/22 KV Substation will affect power supply in Muthur, Ayyampalayam, Nallur, Vadugapalayam, Mannur, Ramapattinam, Devampadi, Vallaiyakoundannur, Bodipalayam, Sakthigarden, Golden City, Gandhinagar, Ponnapuram, Sangampalayam, Valavan Nagar, and JJ Kalani. These areas depend on the Thalakkarai Muthur Feeder, which will be under maintenance during this period. This feeder maintenance is intended to improve long-term reliability and reduce the risk of unexpected outages.

Marichanaicken Palayam Power Cut 21-1-2024:

Areas connected to the Marichanaicken Palayam 110 KV Substation—including M.N. Palayam, Vaalai Kombunaagur, Subiyakoundanpudur, Alangadavu, Valanthayamaram, Meenakshipuram, Kulathupudur, Pariyothu, Dheevanshapudur, Kanapathipalayam, Kovinthapuram, Kaaliyappa Koundanpudur, and Aathupollachi—will experience power outages as maintenance work is conducted on the substation and feeder lines.

Type of Work and Purpose

This scheduled substation and feeder maintenance will involve regular inspections, updates to infrastructure, and essential repairs. By proactively performing this maintenance, TANGEDCO aims to:

  • Enhance the reliability and safety of the power network in Udumalpet.
  • Minimize future outages and improve power quality.
  • Support the growing energy requirements in both residential and commercial areas.

How to Check 21-1-2024 Power Outage Information on TANGEDCO Website

For real-time updates or additional information on scheduled outages, residents can access TANGEDCO’s website:

  • Select Your Area:
    • Navigate to the “Select Circle” option and choose Udumalpet.
  • Enter Verification Code:
    • Type in the code displayed in the image. Click “Refresh” if the image does not load.
  • Submit and View Details:
    • Click “Submit” to access detailed outage information, including affected areas and expected restoration times.
WhatsApp Group Join Now

Telegram Group Join Now

Leave a Comment